Memo for preparation before beam time

1--2 week before beam time
  • Cabling: 3 HVs, 8 signals, 3 additional lemo (for PMT signal, motor control, motor center), preamp-power.
  • Gas connection. check with bubble vessels.
  • Check signals with cosmic rays or beta sources.
Before closing the area
  • check again whether all cable and gas connection are still ok.
  • check whether protection windows are removed
  • start gas flow
  • Switch on preamp-power
  • TPC-in-Air: box for calibration grid should not hit neighboring devices
  • TPC-in-vacuum: cables should have enought length for pressure-drives

-- NisanYaprakBenal - 2026-10-27
Please login to edit this topic
Topic revision: r2 - 2026-10-30, NisanYaprakBenal
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSI Wiki? Send feedback | Legal notice | Privacy Policy (german)