Welcome to the InterLAC web

Current design

The InterLAC ComponentList will be updated in this Wiki continuously. Goal for beam operation of InterLAC is Ar8+ at 1.4 MeV /u and 100µA with a pulse length of 200µs. In a 2nd step Xenon beams will be produced. Availability of longer pulse lengths will depend on the capability of the RFQ, which will be tested in Q2/2027.

InterLAC_2829_260915.jpg

The beamline design shown above is now (09/26) frozen and based on HLI and SIBAF layouts, with modifications motivated by the availability of components and operational experiences at HLI, HIT, and CNAO.

Project structure

The InterLAC project is part of the UNILAC restoration project and is integrated into the overall project structure as described in documents here: https://sf.gsi.de/library/f84facf5-a9cc-4903-b170-4b022e581c90/Gesamtprojekt%20UNILAC%20Reparatur%20und%20Interimsl%C3%B6sung/

Project coordination

Work on InterLAC is coordinated by the two co-projectleaders

Hartmut Vormann (tel: 3402)

Gregor Loisch (tel: 3646)

Distribution of informations

Regular meetings are held every two weeks in odd calendar weeks.

A mailing list (interlac-wps) is set up and information is distributed via email and regular meetings on a weekly basis.

Work breakdown

This is the current work breakdown structure:

260602_InterLAC_WBS_Mk2.png

InterLAC Web Utilities

I Attachment Action Size Date Who Comment
260602_InterLAC_WBS_Mk2.pngpng 260602_InterLAC_WBS_Mk2.png manage 148 K 2026-06-02 - 10:29 GregorLoisch  
260629_IL_layout.jpgjpg 260629_IL_layout.jpg manage 44 K 2026-06-29 - 11:46 GregorLoisch  
InterLAC_2829_260915.jpgjpg InterLAC_2829_260915.jpg manage 283 K 2026-09-15 - 10:43 GregorLoisch  
Please login to edit this topic
Topic revision: r8 - 2026-09-15, GregorLoisch
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSI Wiki? Send feedback | Legal notice | Privacy Policy (german)