May 4, 2006, 13:30
Room: Vorraum der Atomphysik, GSI
Agenda
- Introduction
- Open discussion
Participants:
DietrichBeck,
HolgerBrand,
FrankHerfurth,
MichaelKaiser,
OliverKester,
ChristophorKozhuharov,
StephenKoszudowski,
LudwigDahl
Meeting minutes:
- Frank gave a brief introduction of the HITRAP system. The prepared tranparencies guided the discussion.
- Parameter
- Configuration paramanter and
- Dynamic Paramter
- Interface between the experiment control system and accelerator
- UfsAcc: This is an interface to the accelerator control system.
- Udo Kause is responsible for access permissions.
- A LabVIEW interface and a CS interface class are available.
- Is a reservation mechanism necessary? On which side?
- Accelertator
- Experiment control system
- Is a synchronisation via phone sufficient?
- Integration of the control system into
- accelerator control or
- CS framework?
- This decision may has consequences for the selection of hardware interfaces.
- What about service (maintenace and on-call duty)?
- Responsibilities for shared devices
- Some devices mast be shared between the accelerator and experiment control systems.
- At least all devices up to the first diagnostics station are affected.
- Vaccuum system?
- What else?
- Interface for experiments connected to HITRAP
- There must be a timing interface
- This could be implemented by using a NI-RIO (FPGA) card.
- Software interface for slow communication
- EE/KS will support the development of the control system by
- Maintance of the CS framework
- Design and code reviews
- Support of students
All: Please add what I have missed.
To Do
Please check the
HTToDoList.
All: Please add what I have missed.
Next Meeting
13.09.2006
--
HolgerBrand - 04 May 2006
Minutes (15/05/06)
--
OliverKester - 12 Oct 2006