| 2 |
comparator box ESR extraction |
|
x |
DB |
|
2020 (2020) |
| 3 |
rf phase prediction check at PM |
|
x |
DB |
|
2020 (2020) |
| 4 |
gathering of monitoring data at PM |
|
|
DB |
6 |
2020 (2020) |
| 5 |
concept CRYRING kicker control |
|
|
DB |
|
2020 (2021) |
| 6 |
'error forwarding' via messages |
|
|
DB |
|
2020 (2020) |
| 7 |
implement CRYRING kicker control |
|
|
DB |
|
2020 (2022) |
| 8 |
control system integration |
|
|
DB |
13 |
2020 (2022) |
| 9 |
CBU FESA class |
|
|
DB |
|
2020 (2021) |
| 10 |
LSA and Model integration |
|
|
DB |
|
2020 (2021) |
| 11 |
CBU command line interface |
|
x |
DB |
|
2020 (2020) |
| 12 |
monitoring command line interface |
|
x |
DB |
|
2020 (2020) |
| 13 |
diagnostic data to graylog |
|
|
DB |
|
2020 (2022) |
| 14 |
control / monitoring PC in R29.5 |
|
|
DB |
|
2020 (2020) |
| 15 |
additional patch panel in in R29.5 |
|
|
DB |
|
2020 (2020) |
| 16 |
additional TR in R29.5 |
|
|
DB |
|
2020 (2020) |
| 17 |
on-line DAQ: rising edges only |
|
|
DB |
|
2020 (2020) |
| 18 |
BuTiS and WR clocks in R29.5 |
|
|
DB |
|
2020 (2020) |
| 19 |
better installation in SIS kicker room |
|
|
DB |
|
2020 (2021) |
| 20 |
installation at PHELIX |
|
|
DB |
|
2020 (2021) |
| 21 |
B2B @ CBU (mode 4) |
|
|
DB |
|
2020 (2020) |
| 22 |
timeout wait4eca ms->us |
|
|
DB |
|
2020 (2021) |
| 23 |
monitoring of 'matching' |
|
|
DB |
|
2020 (2020) |
| 24 |
socat for dev/wbm1 |
|
x |
DB |
|
2020 (2020) |
| 25 |
protection against 'late events' |
|
|
DB |
|
2021 (2021) |
| 26 |
'kicker snooping' |
|
|
DB |
|
2021 (2021) |
| 27 |
unambigous indexing (BPID?) |
|
|
DB |
|
2021 (2021) |
| 28 |
testing for broader nue and H range |
|
|
DB |
|
2021 (2021) |
| 29 |
more modular acquisition and monitoring |
|
|
DB |
|
2021 (2021) |
| 30 |
sufficiently 'add of beat periods' |
|
|
DB |
|
2021 (2021) |
| 31 |
check ESR CBU for bad trigger (EKS) |
|
|
DB |
|
2021 (2021) |
| 32 |
statistics for kicker diagnostics |
|
|
DB |
|
2021 (2021) |
| 33 |
OpReady (nolink, nolock) |
|
|
DB |
|
2021 (2021) |
| 35 |
Group DDS for testing (SIS18, ESR) |
|
|
DB |
|
2021 (2022) |
| 34 |
use ID Mask when building messages |
|
|
DB |
|
2021 (2021) |
| 36 |
fix phase measurements at higher nue |
|
|
DB |
|
2021 (2021) |
| 37 |
monitoring: add time+date |
|
|
DB |
|
2021 (2021) |
| 38 |
oscilloscope: set time+date |
|
|
DB |
|
2021 (2021) |
| 39 |
labeling of cables in BG 1.016 |
|
|
DB |
|
2021 (2025) |
| 40 |
rarely: PM fails @ 2687756.996606 Hz |
|
|
DB |
see 41 |
2021 (2021) |
| 41 |
error counter/handling in monitoring |
|
|
DB |
|
2021 (2021) |
| 42 |
beating: sometimes 1 period too early/late |
|
|
DB |
|
2021 (2021) |
| maybe related to late message prevention |
|
|
|
|
|
| 43 |
remove unused code from b2b-ctl |
|
|
DB |
|
2021 (2021) |
| 44 |
get scope repaired and reinstalled |
|
|
DB |
|
2021 (2021) |
| 45 |
installation new comparators |
|
|
DB |
|
2021 (2021) |
| SIS18 kicker room |
|
|
DB |
|
2021 (2021) |
| ESR kicker room |
|
|
DB |
|
2021 (2021) |
| SIS18 and ESR RRF supply rooms |
|
|
DB |
|
2021 (2021) |
| YR RRF supply room |
|
|
DB |
|
2021 (2021) |
| 46 |
implement CMD_B2B_START as trigger |
|
|
DB |
|
2021 (2021) |
| 47 |
power outlets in YR kicker racks |
|
|
DB, JF |
|
2021 (2021) |
| 48 |
ACC outlets in YR kicker racks |
|
|
DB, ? |
|
2021 (2021) |
| 49 |
WR outlets in YR kicker racks |
|
|
DB, ? |
|
2021 (2021) |
| 50 |
signal sources and sinks in YR kicker racks |
|
|
DB, JF, UR |
|
2021 (2022) |
| 51 |
installation CBU + PM YR RRF room |
|
|
DB, DL |
|
2021 (2021) |
| 52 |
installation KD YR cave (injection) |
|
|
DB, JF |
|
2021 (2022) |
| 53 |
installation KD YR cave (extraction) |
|
|
DB, DL |
|
2021 (2022) |
| 54 |
re-installation KD SIS18 (extraction) |
|
|
DB, DL |
|
2021 (2021) |
| 55 |
clean up event numbers |
|
|
DB |
|
2021 (2021) |
| 56 |
nomen for FESA classes |
|
|
DB |
|
2021 (2021) |
| 57 |
b2b-viewer: KTE-fin buggy, fix |
|
|
DB |
|
2021 (2022) |
| 58 |
labeling of cables in TH (rf-container) |
|
|
DB |
|
2021 (2024) |
| 59 |
real DDS frequency measurement |
|
|
DB, MR |
|
2021 (2022) |
| 60 |
YR kicker, connection to probes (-> KK/EE) |
|
|
DB, JF |
|
2021 (2023) |
| 61 |
signal and comparator setting DDS (requires sine signal) |
|
|
DB, DL |
|
2021 (2022) |
| 62 |
signal and comparator setting probes (SIS, ESR) |
|
|
DB, KK, JF |
|
2021 (2023) |
| 64 |
PM: frequency measurement down to 40 kHz |
|
|
DB, MR |
67 |
2021 (2021) |
| 65 |
h=1 operatation SIS->ESR->YR |
|
|
DB |
|
2021 (2021) |
| 67 |
PM: phase measurement down to 40 kHz |
|
|
DB, MR |
|
2021 (2021) |
| 68 |
system monitor: fix 'no_link text issue |
|
|
DB |
|
2021 (2021) |
| 70 |
'clear diag' should clear all status bits |
|
|
DB |
|
2022 (2024) |
| 73 |
trigger event: no LSA/ID data in param field |
|
|
DB, CCT |
|
2022 (2023) |
| 74 |
trigger event: correct SID for injection ring |
|
|
DB, DDay |
|
2022 (2023) |
| 76 |
old data b2b-mon: mark entries > 24h |
|
|
DB |
|
2022 (2023) |
| 82 |
Data Supply: always schedule CMD_B2B_START (even in Mode OFF) |
|
|
DB, CCT |
|
2022 (2023) |
| 83 |
kickers: comparator setting via remote control |
|
|
DB, KK |
|
2022 (2024) |
| 84 |
DDS frequency measurement at injection ring |
|
|
DB |
82 |
2022 (2023) |
| 85 |
detect falling edge of probe signal |
|
|
DB |
83 |
2022 (2023) |
| 87 |
sub-ns phase measurement |
|
|
DB |
|
2022 (2023) |
| 88 |
suppress injection kick in case of preceding error (stacking!) |
|
|
DB |
|
2022 (2023) |
| 89 |
FESA Klasse / shared lib: Ruecklese fuer Multi-Beat-Tune pruefen |
|
|
DB |
|
2022 (2023) |
| 92 |
phase/frequency monitoring even in mode 'OFF' |
|
|
DB |
82 |
2022 (2023) |
| 94 |
issue kick length SIS18: shifted to next execution |
|
|
DB |
|
2024 (2024) |
| 95 |
bug: negative phase shift broken (CBU); requires phase reset |
|
|
DB, |
|
2024 (2025) |