S8 — SC81 Scintillator Ladder (GTH4DI5 _S)

FRS Home Page - Areas.gif S8 Pictures Drawings Cable Connections

Detector Material

Size
(width*height)
[mm*mm]

Thickness
[mm]
TH4DI5_S
position
[mm]
Installed since
1 BC 420 220 * 100 5.0 14.0 09.Oct.2020
2 BC 420 220 * 100 1.04 124.0 09.Oct.2020
3 BC 420 220 * 100 2.75 - 3.03 234.0 15.May 2018
4 EJ 230 220 * 45 2.7
with cross slit 100x30mm, width=3mm
309.0 11.Nov.2020
5 EJ 230 220 * 45 5.0 357.0 09.Oct.2020
6 EJ 230 220 * 45 1.04 415.0 09.Oct.2020
7 EJ 230 220 * 45 1.04 460.0 09.Oct.2020
    OUT   576.0  

On 25th Jan 2021 H6533 PMTs were inserted.

Sc81 cabling
Cabling to local crate with CFD, connections to S2 and TDC, and to local oscilloscope for monitoring (SCI81-cabling.pdf).

 

-- HelmutWeick - 2022-01-19
I Attachment Action Size Date Who Comment
Areas.gifgif Areas.gif manage 1 K 2021-07-09 - 20:22 SagarRoy  
SCI81-cabling.pdfpdf SCI81-cabling.pdf manage 101 K 2022-01-19 - 15:08 HelmutWeick scheme of cabling of Sc81
Topic revision: r3 - 2022-01-19, HelmutWeick - This page was cached on 2024-11-25 - 15:51.

This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSI Wiki? Send feedback | Legal notice | Privacy Policy (german)