Maintenance to be performed

Before every experiment

  • Check Sheath level (>= 1/2 bottle)
  • Check for fluidics / laser discrepancies in camera
    • alignment of sample injection ok?
    • alignment/look of laser beams ok?
    • check blue (and red if used) laser with calibration beads
      • very thin peaks in histograms? all ok!
      • broad and/or undefined peaks? Ask Till. If Till is not available, ask Michael Scholz.

Weekly

  • Check Waste level
  • Leave blue solution in device overnight (not longer!) (Warning appears on FACS log)
  • Routine bead measurement (Till)
  • Empty waste bin

Monthly

  • Check UV lamp runtime (<300 hours) (Warning appears on FACS log)
  • Check liquid level of waste canisters

3-Monthly

  • Check supplies (tubes, lamps, liquids)
Topic revision: r3 - 2011-08-15, TillDettmering
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSI Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)